Included in Rio Tinto’s annual Mineral Resources and Ore Reserves tables, released to the market today as part of its 2016 annual report, are increases in Mineral Resources for Rio Tinto’s 100%-owned Jadar Lithium and Borates Mineral Project in Jadar, Serbia.
Rio Sava was faced with a dilemma. The 3D seismic survey was due to start in April but much of the proposed drilling site was underwater after two particularly wet winters.
As part of Rio Sava’s community engagement programme, Rio Sava staff members have visited local elementary schools to talk about their work. For geologist Ana Arifovic, going on these visits is one of the things she enjoys most about her job.